Elevator trunking operation process (2)

19-05-2019

Reserved hole
According to the axis part of the design icon, the prefabricated iron frame is fixed at the marked position, and straightened and straightened. After the cast-in-place concrete solidification template is removed, the frame is folded down and the hole is closed. .

·

·

Elevator industry leader

·

·

Copyright © FUJI Elevator Co.,Ltd. All Rights Reserved.
X
Online consulting
X
5

Telephone

  • 0086-572-3330082
展开