Do you know the elevator installation and installation? (1)

19-05-2019

Taboo 1: Elevator commissioning without equipment installation
Consequences: When the elevator is commissioned, the scaffolding in the hoistway must be removed. After the demolition, equipment installation work will be carried out, which will bring certain dangers and difficulties to the elevator installation work.
Measures: Organize self-inspection and mutual inspection of operators before adjusting the test run. Construction technicians should conduct a thorough inspection to prevent leakage. The civil engineering demolition scaffolding can only be notified in writing if it is confirmed after careful inspection. Generally, the well leveling device can be carried out after the motor train.

·

·