19 . 05 month 19 2019 year
>Label:News
Elevator trunking operation process (4)
Metal expansion bolt installation (1) The concrete wall should be firm and strong, and its compressive strength should be no less than 24 MPa. The thickness of the concrete wall should be above 120 mm...
19 . 05 month 19 2019 year
>Label:News
Bracket and hanger installation requirements (1) The steel used for the bracket and the hanger should be straight and without significant distortion. The length and length of the material after cuttin...
19 . 05 month 19 2019 year
>Label:News
Reserved hole According to the axis part of the design icon, the prefabricated iron frame is fixed at the marked position, and straightened and straightened. After the cast-in-place concrete solidific...
19 . 05 month 19 2019 year
>Label:News
Elastic line positioning According to the design drawing, determine the installation position of the electrical equipment such as the incoming line, box, box, cabinet, etc., from the beginning to the ...

·

·

Elevator industry leader

·

·

Copyright © FUJI Elevator Co.,Ltd. All Rights Reserved.
X
Online consulting
X
5

Telephone

  • 0086-572-3330082
展开