Machine room trunking installation (2)

19-05-2019

Main equipment
(1) Pencil, tape measure, pendant, powder bag, tin pot, blowtorch.
(2) Electrical tools, hand drills, impact drills, multimeters, toolboxes, etc.
Working conditions
(1) In accordance with the structural construction of civil works, the reserved holes, pre-embedded booms and hangers are all completed.
(2) Threading and painting in the tank can be carried out only after the spray and paint on the top and the wall are completed.
(3) The civil construction work in the construction shaft has been completed.

·

·